01
Subfloor assessment
We check moisture, level, and squeaks — and address each before install day.
02
Acclimation
Material rests on-site so it matches your home's temperature and humidity.
03
Layout planning
Plank direction, seam stagger, and transition points are mapped before cutting.
04
Install & trim
Floors are laid, trimmed at walls, and finished with quarter-round or shoe molding as needed.
— Other Services
